Location: London Borough of Tower Hamlets
Client: Ravensland Ltd
Architect: Syndicate West
Document(s) prepared: Demolition Method Statement and Construction Management Plan (CMP)
Scheme size: Phased residential scheme — mansard roof extension to an existing mixed-use building creating two one-bedroom flats, plus erection of a new four-storey dwellinghouse to the rear
A CMP was required to discharge a planning condition before any demolition or construction could begin on this two-phase residential scheme: a mansard roof extension and internal reconfiguration at 420 Bethnal Green Road, followed by a new-build four-storey house at 1 Viaduct Place to the rear.

We inspect the building to identify structural and non-structural materials present.

We classify materials as reusable, recyclable, or waste, in line with the waste hierarchy.

We assess the practicality and cost-effectiveness of reuse and recycling options for the materials identified.

We compile our findings into a report providing actionable recommendations, quantities, and evidence to support your BREEAM assessment and planning submission.
Following consultation and discussion with the council's highways team, the Construction Management Plan was accepted
The planning condition was formally discharged, allowing the client to proceed with construction